I have an issue with my incremental backups hanging up in Ghost 15. It's extremely frustrating since this is the exact same problem I had with 14.. Noticed it today when my weekly backup was running. I came in and it said 23 hours remaining. I stopped the job and deleted the old backup from Ghost and my backup drive, then I defined a new job. I checked to see if there was a catalog file that needed to be deleted but there was nothing there. Thought that was strange.
On a side not, this occurred after I used the Norton uninstall tool and removed and then reinstalled all my Norton products again.
Anyway, I tried to run the backup again, and same thing happened, it was hung at 5%. I hate to think I'm going to have to uninstall everything again. Any thoughts?