Norton Save & Restore 11.0 - Scheduled Backups Disabled for Removable Drives

I'm using Norton Save & Restore 11.0 (From Help>About) and am having this problem with scheduled backups.

 

I have scheduled backup jobs for a removable drive.  However, when I disconnect the removable drive, in N&S, the backup scheduled job will become "Disabled".

 

When I reconnect the removable drive, the N&S Job will STAY disabled until I enable it manually by selecting "Enable Backup". 

 

This is quite troublesome as my workflow is to bring my removable HDD to work, and reconnect it when I get back and have the scheduled job run when I'm asleep.  This defeats the purpose of having a scheduled job if I always have to remember to have to enable it.

 

Any help would be welcome.