I'm using Norton Save & Restore 11.0 (From Help>About) and am having this problem with scheduled backups.
I have scheduled backup jobs for a removable drive. However, when I disconnect the removable drive, in N&S, the backup scheduled job will become "Disabled".
When I reconnect the removable drive, the N&S Job will STAY disabled until I enable it manually by selecting "Enable Backup".
This is quite troublesome as my workflow is to bring my removable HDD to work, and reconnect it when I get back and have the scheduled job run when I'm asleep. This defeats the purpose of having a scheduled job if I always have to remember to have to enable it.
Any help would be welcome.