Scheduling "copy hard disk" job in ghost12

Hi,

I would like to know if there is a way to script a "copy hard disk" operation in Ghost12 so that I can

create a script and add it to the job scheduler. Any hints are appreciated.

What I want to do is something like this:

 

clone c: e:

label e: MMDDHHMM

 

This would allow me to get rid to most of the useless backup software I have tried to get a full backup

as cloning is the fastest way and  I would be sure of data consistency. Doing this on the 2 spare

drives of my server while the shop is closed would allow me to restore the machine by simply swapping

the drives and rebooting without loosing to much work and with zero downtime.

 

Thanks in advance and best regards,

xyz23